Rules • IN

Plug-In Solar in Indiana

Indiana phased out retail net metering under SEA 309 (2017). New residential solar customers receive 'excess distributed generation' credit at roughly the wholesale rate plus a small adder. Plug-in kits face the same interconnection paperwork.

Restricted or unfavorable
Disclaimer: This page is educational and not legal or electrical advice. Policies change frequently — verify every detail with your utility, state public utility commission, energy office, local building department, and a licensed electrician before purchasing or installing any plug-in solar equipment.

Net metering & export compensation

Legacy net metering closed July 1, 2022 for new customers of major IOUs. EDG credit ≈ wholesale + 25%.

Interconnection process

IURC 170 IAC 4-4.3 interconnection standards.

Permitting & inspection

Local building departments; Indiana has a statewide electrical code based on NEC.

Utilities operating in this state

Duke Energy Indiana, AES Indiana (IPL), CenterPoint (Vectren), NIPSCO, I&M, plus REMCs.

Electrical code (NEC) considerations

The U.S. National Electrical Code (NEC) does not have a listed pathway for backfeeding a standard 120 V receptacle from a solar inverter. Article 705 covers interconnected power production sources and generally expects a dedicated, breakered, labeled circuit. Many AHJs that follow NEC 2017/2020/2023 will not approve a cord-and-plug PV connection on that basis, regardless of state policy.

HOA, landlord & solar access

Check your lease, HOA covenants, and condo rules. Many states have a 'solar access' or 'solar rights' law that limits HOA restrictions on rooftop PV, but those statutes were written for permanent installations and rarely mention plug-in or balcony kits explicitly. Renters almost always need written landlord permission.

Official sources to consult

Bottom line for plug-in solar buyers in Indiana

Even where state policy is favorable, U.S. utilities and inspectors generally do not recognize a cord-and-plug PV connection. If you want to be fully code-compliant and earn export credits, plan on a permitted, hard-wired install by a licensed electrician with a signed interconnection agreement. Off-grid uses (running a single appliance, charging a battery, RV/shed power) avoid most of these rules but still need to follow product instructions and basic electrical safety.

Other states

See all 50 states + DC