Ohio has retail-rate net metering up to 120% of usage for IOU customers under O.R.C. § 4928.67 and PUCO rules. Plug-in kits still need permits and interconnection paperwork.

Generally allowed (with conditions)
Disclaimer: This page is educational and not legal or electrical advice. Policies change frequently — verify every detail with your utility, state public utility commission, energy office, local building department, and a licensed electrician before purchasing or installing any plug-in solar equipment.

Net metering & export compensation

Retail energy + capacity credit; PUCO has gone back and forth on whether ancillary charges apply.

Interconnection process

PUCO Chapter 4901:1-22 interconnection rules.

Permitting & inspection

Local building departments; Ohio Construction Industry Licensing Board licenses electrical contractors.

Utilities operating in this state

AEP Ohio, FirstEnergy Ohio (Ohio Edison/CEI/Toledo Edison), Duke Energy Ohio, AES Ohio (DP&L), plus municipal utilities (AMP) and co-ops.

Electrical code (NEC) considerations

The U.S. National Electrical Code (NEC) does not have a listed pathway for backfeeding a standard 120 V receptacle from a solar inverter. Article 705 covers interconnected power production sources and generally expects a dedicated, breakered, labeled circuit. Many AHJs that follow NEC 2017/2020/2023 will not approve a cord-and-plug PV connection on that basis, regardless of state policy.

HOA, landlord & solar access

Check your lease, HOA covenants, and condo rules. Many states have a 'solar access' or 'solar rights' law that limits HOA restrictions on rooftop PV, but those statutes were written for permanent installations and rarely mention plug-in or balcony kits explicitly. Renters almost always need written landlord permission.

Official sources to consult

Bottom line for plug-in solar buyers in Ohio

Even where state policy is favorable, U.S. utilities and inspectors generally do not recognize a cord-and-plug PV connection. If you want to be fully code-compliant and earn export credits, plan on a permitted, hard-wired install by a licensed electrician with a signed interconnection agreement. Off-grid uses (running a single appliance, charging a battery, RV/shed power) avoid most of these rules but still need to follow product instructions and basic electrical safety.