Rhode Island has retail-rate net metering plus the Renewable Energy Growth (REG) program for fixed performance-based incentives. R.I. Gen. Laws § 39-26.4. Permits and licensed electricians required.

Generally allowed (with conditions)
Disclaimer: This page is educational and not legal or electrical advice. Policies change frequently — verify every detail with your utility, state public utility commission, energy office, local building department, and a licensed electrician before purchasing or installing any plug-in solar equipment.

Net metering & export compensation

1:1 retail credit; system size up to 25 kW residential at simplified application.

Interconnection process

PUC interconnection tariff administered by Rhode Island Energy.

Permitting & inspection

Local building departments; RI Department of Business Regulation licenses electricians.

Utilities operating in this state

Rhode Island Energy (formerly National Grid RI), Pascoag Utility District, Block Island Power.

Electrical code (NEC) considerations

The U.S. National Electrical Code (NEC) does not have a listed pathway for backfeeding a standard 120 V receptacle from a solar inverter. Article 705 covers interconnected power production sources and generally expects a dedicated, breakered, labeled circuit. Many AHJs that follow NEC 2017/2020/2023 will not approve a cord-and-plug PV connection on that basis, regardless of state policy.

HOA, landlord & solar access

Check your lease, HOA covenants, and condo rules. Many states have a 'solar access' or 'solar rights' law that limits HOA restrictions on rooftop PV, but those statutes were written for permanent installations and rarely mention plug-in or balcony kits explicitly. Renters almost always need written landlord permission.

Official sources to consult

Bottom line for plug-in solar buyers in Rhode Island

Even where state policy is favorable, U.S. utilities and inspectors generally do not recognize a cord-and-plug PV connection. If you want to be fully code-compliant and earn export credits, plan on a permitted, hard-wired install by a licensed electrician with a signed interconnection agreement. Off-grid uses (running a single appliance, charging a battery, RV/shed power) avoid most of these rules but still need to follow product instructions and basic electrical safety.

Other states

See all 50 states + DC